Sunday, 21 April 2013

Production log 9


This week was our final week of production. In this week we had completed all the scenes as we filmed the main scenes in the basement in our holidays. We had finished most of the editing but just needed to refine it. As we were almost done we got some feedback from our teacher about the work and she gave us feedback about re-filming it but with most shots and angles as that was what was lacking in our work so far.


The issue we had was that we had to re-film the shots again as we needed a better variety of shots. Another issue was the actors. The actors we needed weren't available so we used one of our partners to play the police officer. we thought we would have two officers in the scene to build the tension and make it seem like a proper scene but we lacked in actors.

 We did have a problem with the SD card being corrupted resulting in us being able to access the footage. To overcome this issue, the shots we had, had to be re-filmed again. This shot we re-filmed was a majority of the opening sequence( 2 minutes). These scenes we re-filmed and put onto the Mac and had been edited. 

On the day of the deadline, we completed the editing of the opening sequences and the music was found online. A problem we had was that we forgot about the Mac being booked with another group so they had break and lunch booked for their work but we had the lesson to do it on Thursday  After school the graphics were put on to the footage but there was a problem with it. This was that the graphic duration times could not be changed due to setting problems. but this issue was over come and the duration was changed. The music was added in after the graphics were completed.

On Fridays lesson, We watched other students opening sequence videos and gave them feedback of what their strengths were and what improvements they could have made etc. There wasn't enough time for our work to be shown so it will be shown next week.